Maastricht, Nijverheidsweg ➞ Maastricht, P&R Maastricht-Noord
Maastricht, P&R Maastricht-Noord ➞ Maastricht, Nijverheidsweg
Route Path (Streets & Roads)
Alle gegevens zijn beschikbaar in de GTFS-feed: nrw
Metro 10 FAQ
-
What time does the 10 metro start operating?
Services on the 10 metro start at 05:53 on maandag, dinsdag, woensdag, donderdag, vrijdag, zaterdag, zondag.
-
What time does the 10 metro stop working?
Services on the 10 metro stop at 22:47 on maandag, dinsdag, woensdag, donderdag, vrijdag, zaterdag, zondag.
-
Is there a 10 metro stop near me?
Click here to view the nearest 10 metro stop.
10 (Maastricht Metro Lines)
The first stop of the 10 metro route is Maastricht, Nijverheidsweg and the last stop is
Maastricht, P&R Maastricht-Noord. 10 is operational during dagelijks.
Additional information: 10 has 15 stops and the total trip duration
for this route is approximately 28 minutes.
See why over 2 million users trust and consider busmaps.com as the best public transport website. busmaps gives you Maastricht Metro Lines suggested routes, real-time bus tracker, line route maps in Maastricht, and helps to find the closest 10 metro stops near you. No internet available? Download an offline PDF map and bus schedule for the 10 metro to take on your trip.