Maastricht, Potteriestraat – Maastricht, Randwyck Forum Mecc
Maastricht, Randwyck Forum Mecc – Maastricht, Potteriestraat
Route Path (Streets & Roads)
Schedules and stops for this route are published in GTFS: nrw
Metro 7 FAQ
What time does the 7 metro start operating?
Services on the 7 metro start at 06:29 on Montag, Dienstag, Mittwoch, Donnerstag, Freitag, Samstag, Sonntag.
What time does the 7 metro stop working?
Services on the 7 metro stop at 23:22 on Montag, Dienstag, Mittwoch, Donnerstag, Freitag, Samstag, Sonntag.
Is there a 7 metro stop near me?
Click here to view the nearest 7 metro stop.
7 (Maastricht Metro Lines)
The first stop of the 7 metro route is Maastricht, Potteriestraat and the last stop is Maastricht, Randwyck Forum Mecc. 7 is operational during täglich.
Additional information: 7 has 22 stops and the total trip duration for this route is approximately 39 minutes.
See why over 2 million users trust and consider busmaps.com as the best public transport website. busmaps gives you Maastricht Metro Lines suggested routes, real-time bus tracker, line route maps in Maastricht, and helps to find the closest 7 metro stops near you. No internet available? Download an offline PDF map and bus schedule for the 7 metro to take on your trip.
